National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


桦甸市| 香港 | 江孜县| 简阳市| 体育| 平原县| 五原县| 吉木萨尔县| 万州区| 鄂温| 安溪县| 比如县| 滨海县| 上杭县| 稷山县| 山阳县| 清丰县| 南涧| 沾化县| 清涧县| 城市| 达尔| 合山市| 张掖市| 孝昌县| 永定县| 古田县| 长葛市| 藁城市| 新田县| 屏东市| 白城市| 永济市| 静安区| 隆安县| 遵化市| 新源县| 札达县| 景德镇市| 安福县| 临安市|